All work had to be concluded on August 22, at the beginning of classes.  Steel structure was the best option in order to finish the work on time  Real estate  availability in the school grounds was very limited. The challenge was to build a basketball facility above four large classrooms.  Neoprene was used to suppport the second floor slab, and sound transmission was brought to an acceptable level.